Skip to content

fix(caps): multiple fixes #2042

fix(caps): multiple fixes

fix(caps): multiple fixes #2042

Triggered via pull request July 18, 2023 13:02
Status Failure
Total duration 41m 0s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

integration.yml

on: pull_request
Matrix: network
Matrix: openrc-musl
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
network (fedora:latest, network-legacy, 20)
Process completed with exit code 2.
network (fedora:latest, network-legacy, 60)
Process completed with exit code 2.
network (fedora:latest, network-manager, 60)
Process completed with exit code 2.
network (fedora:latest, network-manager, 35)
Process completed with exit code 2.
network (fedora:latest, network-manager, 20)
Process completed with exit code 2.
test (fedora:latest, 04)
Process completed with exit code 2.
test (debian:latest, 18)
Process completed with exit code 2.
test (fedora:latest, 14)
Process completed with exit code 2.
test (opensuse:latest, 18)
Process completed with exit code 2.
test (opensuse:latest, 13)
Process completed with exit code 2.
test (opensuse:latest, 14)
Process completed with exit code 2.
test (fedora:latest, 15)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 30 minutes.
test (fedora:latest, 15)
The operation was canceled.
test (opensuse:latest, 03)
The job running on runner GitHub Actions 1 has exceeded the maximum execution time of 30 minutes.
test (opensuse:latest, 03)
The operation was canceled.