Skip to content

[DPE-5350][DPE-5416] Add sbom generation in CI #385

[DPE-5350][DPE-5416] Add sbom generation in CI

[DPE-5350][DPE-5416] Add sbom generation in CI #385

Triggered via pull request September 12, 2024 12:20
@welpaolowelpaolo
synchronize #107
dpe-5350-3.4
Status Failure
Total duration 20m 31s
Artifacts 1

integration.yaml

on: pull_request
build-rock  /  lint
4s
build-rock / lint
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

3 errors
integration (integration, 1.30-strict/stable)
Process completed with exit code 2.
integration (integration, 1.29-strict/stable)
Process completed with exit code 2.
integration (integration, 1.28-strict/stable)
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
charmed-spark Expired
2.73 GB