Skip to content

[DPE-5350][DPE-5416] Add sbom generation in CI #371

[DPE-5350][DPE-5416] Add sbom generation in CI

[DPE-5350][DPE-5416] Add sbom generation in CI #371

Triggered via pull request September 5, 2024 14:28
Status Cancelled
Total duration 16m 57s
Artifacts 1

integration.yaml

on: pull_request
build-rock  /  lint
7s
build-rock / lint
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration (integration, 1.30/beta)
Process completed with exit code 2.
integration (integration, 1.28/stable)
Process completed with exit code 2.
integration (integration, 1.29/stable)
Canceling since a higher priority waiting request for 'Spark Image Tests-refs/pull/107/merge' exists
integration (integration, 1.29/stable)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
charmed-spark Expired
2.72 GB