Skip to content

p521: switch to upstream RFC6979-based ECDSA #229

p521: switch to upstream RFC6979-based ECDSA

p521: switch to upstream RFC6979-based ECDSA #229

Triggered via pull request January 16, 2024 23:16
Status Failure
Total duration 1m 17s
Artifacts

bign256.yml

on: pull_request
Matrix: build
Matrix: cross
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

21 errors
build (1.73.0, thumbv7em-none-eabi)
Process completed with exit code 101.
build (stable, wasm32-unknown-unknown)
Process completed with exit code 101.
build (1.73.0, wasm32-unknown-unknown)
The job was canceled because "stable_wasm32-unknown-unk" failed.
build (1.73.0, wasm32-unknown-unknown)
Process completed with exit code 101.
cross (powerpc-unknown-linux-gnu, stable)
Process completed with exit code 101.
build (stable, thumbv7em-none-eabi)
The job was canceled because "stable_wasm32-unknown-unk" failed.
build (stable, thumbv7em-none-eabi)
The operation was canceled.
cross (aarch64-unknown-linux-gnu, 1.73.0)
The job was canceled because "powerpc-unknown-linux-g_2" failed.
cross (aarch64-unknown-linux-gnu, 1.73.0)
Process completed with exit code 101.
cross (armv7-unknown-linux-gnueabihf, 1.73.0)
The operation was canceled.
cross (aarch64-unknown-linux-gnu, stable)
The job was canceled because "powerpc-unknown-linux-g_2" failed.
cross (aarch64-unknown-linux-gnu, stable)
Process completed with exit code 101.
doc
Process completed with exit code 101.
cross (armv7-unknown-linux-gnueabihf, stable)
The job was canceled because "powerpc-unknown-linux-g_2" failed.
cross (armv7-unknown-linux-gnueabihf, stable)
The operation was canceled.
test (x86_64-unknown-linux-gnu, stable)
Process completed with exit code 101.
cross (powerpc-unknown-linux-gnu, 1.73.0)
The operation was canceled.
test (x86_64-unknown-linux-gnu, 1.73.0)
The operation was canceled.
test (i686-unknown-linux-gnu, stable, sudo apt update && sudo apt install gcc-multilib)
The job was canceled because "x86_64-unknown-linux-gn_2" failed.