Skip to content

Support compatibility tools other than Proton out-of-the-box. #828

Support compatibility tools other than Proton out-of-the-box.

Support compatibility tools other than Proton out-of-the-box. #828

Triggered via pull request December 4, 2024 20:34
Status Failure
Total duration 25s
Artifacts

umu-python.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors and 1 warning
Ruff (I001): umu/umu_test_plugins.py#L1
umu/umu_test_plugins.py:1:1: I001 Import block is un-sorted or un-formatted
build (3.11)
Process completed with exit code 1.
build (3.12)
The job was canceled because "_3_11" failed.
Ruff (I001): umu/umu_test_plugins.py#L1
umu/umu_test_plugins.py:1:1: I001 Import block is un-sorted or un-formatted
build (3.12)
Process completed with exit code 1.
build (3.13)
The job was canceled because "_3_11" failed.
build (3.13)
The operation was canceled.
build (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636