Skip to content

Add CR-ready draft location in preparation for CR. #197

Add CR-ready draft location in preparation for CR.

Add CR-ready draft location in preparation for CR. #197

Triggered via push November 19, 2023 21:35
Status Failure
Total duration 1m 9s
Artifacts 1

echidna.yml

on: push
Build, Validate, and Deploy
1m 2s
Build, Validate, and Deploy
Fit to window
Zoom out
Zoom in

Annotations

3 errors
Build, Validate, and Deploy
Process completed with exit code 1.
Build, Validate, and Deploy
Failed. See details above.
Build, Validate, and Deploy
Process completed with exit code 1.

Artifacts

Produced during runtime
Name Size
spec-prod-result Expired
1.76 MB