Skip to content

feat(specialist): add travisEATSbugs-specialist agent file#53

Merged
travisbreaks merged 2 commits into
mainfrom
feat/phase-3c-specialist-2026-05-30
May 31, 2026
Merged

feat(specialist): add travisEATSbugs-specialist agent file#53
travisbreaks merged 2 commits into
mainfrom
feat/phase-3c-specialist-2026-05-30

Conversation

@travisbreaks

Copy link
Copy Markdown
Owner

Summary

Phase 3.C of TadaoOS plan: per-project specialist for travisEATSbugs.

Encodes the live deployment matrix (Pivotal locked at 0.0.7-alpha.0 per D10, LSD live at 0.0.3-alpha.0, teb-cloud paid tier upcoming), the 3-adapter contract (ApiAdapter / AuthAdapter / ThemeAdapter), the Shadow-DOM widget with drawer / overlay / page-mode render, the Worker live at eats.travisfixes.com (D1 + R2 + KV), the CRITICAL CDN distinction (travismakes.org/travis-eats-bugs/widget.js is the bundle CDN; eats.travisfixes.com is the API ONLY until v1.0), the MCP server with 4 tools, the 10 ratified decisions D1-D10, the em-dash CI gate (zero tolerance), and the dependency map.

Test plan

  • Spawn specialist via Agent tool
  • Em-dash gate continues to pass on commits using this specialist

travisbreaks and others added 2 commits May 30, 2026 19:42
Phase 3.C of TadaoOS plan: per-project specialist for travisEATSbugs
(LIVE at Pivotal + Lion's Share Demo, paid teb-cloud tier upcoming
in Phase 3).

Encoded: pnpm workspaces (widget + adapter-cloudflare + adapter-http
+ apps/worker + apps/mcp-server + apps/playground), 3-adapter
contract (ApiAdapter / AuthAdapter / ThemeAdapter), Shadow-DOM
widget with drawer / overlay / page-mode render, Worker live at
eats.travisfixes.com (D1 + R2 + KV), the CRITICAL CDN distinction
(travismakes.org/travis-eats-bugs/widget.js is the bundle CDN;
eats.travisfixes.com is the API ONLY until v1.0), MCP server with
4 tools, live deployments at Pivotal (0.0.7-alpha.0 LOCKED per D10)
+ LSD, 10 ratified decisions, em-dash CI gate (zero tolerance).

Em-dash audit: 0 in file.

Co-Authored-By: Tadao <tadao@travisfixes.com>
Forensic audit (2026-05-30 Wave 5 fact-truth lens) caught that
the specialist claimed Lion's Share Demo (LSD) vendor at
0.0.3-alpha.0 with "Phase 2 work bumps to 0.0.10".

Reality per lions-share/app-cf/package.json: the active link is
file:vendor/travisbreaks-travisEATSbugs-0.0.7-alpha.0.tgz. Both
0.0.3 and 0.0.7 tarballs are in vendor/ but only 0.0.7 is linked.

Fixed 4 locations in the specialist:
- frontmatter description (LSD link version)
- Live deployments table (LSD row)
- Cross-repo dependency-map table (lions-share row)
- Workflow checklist item 13 (vendor-bump note)

Phase 2 work focus updated to "multi-tenant scaffolding; vendor
version already current."

Co-Authored-By: Tadao <tadao@travisfixes.com>
@travisbreaks travisbreaks merged commit 270a3fd into main May 31, 2026
2 checks passed
@travisbreaks travisbreaks deleted the feat/phase-3c-specialist-2026-05-30 branch May 31, 2026 01:33
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant