Skip to content

Pr 1319 feat(new tool) code highlighter #115

Pr 1319 feat(new tool) code highlighter

Pr 1319 feat(new tool) code highlighter #115

Triggered via pull request November 4, 2024 18:29
Status Failure
Total duration 10m 24s
Artifacts

e2e-tests.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test (1/3)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 10 minutes.
test (1/3)
The operation was canceled.
test (3/3)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 10 minutes.
test (3/3)
The operation was canceled.
test (2/3)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 10 minutes.
test (2/3)
The operation was canceled.