Jbaublitz metadata rework integrity #5452
Triggered via pull request
December 16, 2024 18:18
Status
Failure
Total duration
30m 13s
Artifacts
–
main.yml
on: pull_request
stratis-cli-checks
8m 34s
stratis-min-cli-checks
2m 21s
shell-checks
18s
pylint
20s
python-based-tests
2m 6s
Matrix: checks
Matrix: tests-with-testing-repo
Annotations
4 errors
stratis-cli-checks
Process completed with exit code 2.
|
tests-with-testing-repo (HEAD, --post-test-check=verify-filesystem-symlinks --post-test-check=ver...
Process completed with exit code 1.
|
tests-with-testing-repo (v3.6.2, --highest-revision-number=6)
The job was canceled because "HEAD_--post-test-check_ve" failed.
|
tests-with-testing-repo (v3.6.2, --highest-revision-number=6)
The operation was canceled.
|