Skip to content

CI (verilator compatibility): revive monthly compatibility check #54

CI (verilator compatibility): revive monthly compatibility check

CI (verilator compatibility): revive monthly compatibility check #54

Triggered via pull request January 12, 2025 10:28
Status Failure
Total duration 6m 46s
Artifacts

verilator_compatibility.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (4.028)
Process completed with exit code 1.
build (4.100)
The job was canceled because "_4_028" failed.
build (4.100)
The operation was canceled.
build (4.036)
The job was canceled because "_4_028" failed.
build (4.036)
The operation was canceled.
build (4.034)
The job was canceled because "_4_028" failed.
build (4.034)
The operation was canceled.
build (master)
The job was canceled because "_4_028" failed.
build (master)
The operation was canceled.