Skip to content

PR Test

PR Test #3703

Manually triggered January 3, 2025 09:46
Status Cancelled
Total duration 8m 32s
Artifacts

pr-test.yml

on: workflow_dispatch
Matrix: unit-test-backend-1-gpu
unit-test-frontend
3m 32s
unit-test-frontend
unit-test-backend-2-gpu
4m 24s
unit-test-backend-2-gpu
performance-test-1-gpu-part-1
8m 5s
performance-test-1-gpu-part-1
performance-test-1-gpu-part-2
2m 19s
performance-test-1-gpu-part-2
performance-test-2-gpu
7m 29s
performance-test-2-gpu
accuracy-test-1-gpu
5m 21s
accuracy-test-1-gpu
accuracy-test-2-gpu
6m 40s
accuracy-test-2-gpu
Fit to window
Zoom out
Zoom in

Annotations

14 errors
performance-test-1-gpu-part-2
Process completed with exit code 1.
unit-test-backend-1-gpu (0-6)
Process completed with exit code 1.
unit-test-backend-1-gpu (16-23)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (16-23)
The operation was canceled.
unit-test-backend-1-gpu (23-30)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (23-30)
The operation was canceled.
unit-test-backend-1-gpu (30-100)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (30-100)
The operation was canceled.
unit-test-backend-1-gpu (6-16)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (6-16)
The operation was canceled.
unit-test-backend-2-gpu
Process completed with exit code 1.
performance-test-2-gpu
Process completed with exit code 1.
performance-test-1-gpu-part-1
Canceling since a higher priority waiting request for 'pr-test-refs/heads/zhyncs/v0.2.0' exists
performance-test-1-gpu-part-1
The operation was canceled.