Skip to content

PR Test

PR Test #3698

Manually triggered January 3, 2025 09:27
Status Cancelled
Total duration 11m 35s
Artifacts

pr-test.yml

on: workflow_dispatch
Matrix: unit-test-backend-1-gpu
unit-test-frontend
2m 57s
unit-test-frontend
unit-test-backend-2-gpu
11m 12s
unit-test-backend-2-gpu
performance-test-1-gpu-part-1
9m 20s
performance-test-1-gpu-part-1
performance-test-1-gpu-part-2
1m 58s
performance-test-1-gpu-part-2
performance-test-2-gpu
7m 13s
performance-test-2-gpu
accuracy-test-1-gpu
11m 7s
accuracy-test-1-gpu
accuracy-test-2-gpu
6m 8s
accuracy-test-2-gpu
Fit to window
Zoom out
Zoom in

Annotations

15 errors
performance-test-1-gpu-part-2
Process completed with exit code 1.
unit-test-backend-1-gpu (0-6)
Process completed with exit code 1.
unit-test-backend-1-gpu (6-16)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (6-16)
The operation was canceled.
unit-test-backend-1-gpu (16-23)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (16-23)
The operation was canceled.
unit-test-backend-1-gpu (23-30)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (23-30)
The operation was canceled.
unit-test-backend-1-gpu (30-100)
The job was canceled because "_0-6" failed.
unit-test-backend-1-gpu (30-100)
The operation was canceled.
performance-test-2-gpu
Process completed with exit code 1.
accuracy-test-1-gpu
Canceling since a higher priority waiting request for 'pr-test-refs/heads/zhyncs/v0.2.0' exists
accuracy-test-1-gpu
The operation was canceled.
unit-test-backend-2-gpu
Canceling since a higher priority waiting request for 'pr-test-refs/heads/zhyncs/v0.2.0' exists
unit-test-backend-2-gpu
The operation was canceled.