Skip to content

revert: 150% gasUsed refund limit policy #5493

revert: 150% gasUsed refund limit policy

revert: 150% gasUsed refund limit policy #5493

Triggered via pull request November 26, 2024 19:12
Status Failure
Total duration 31m 0s
Artifacts

integration-test.yml

on: pull_request
Matrix: integration-tests
Integration Test Check
24s
Integration Test Check
Fit to window
Zoom out
Zoom in

Annotations

25 errors and 1 warning
Integration Test (EVM Interoperability)
The job running on runner GitHub Actions 171 has exceeded the maximum execution time of 30 minutes.
Integration Test (EVM Interoperability)
The operation was canceled.
Integration Test (Distribution Module)
The job running on runner GitHub Actions 204 has exceeded the maximum execution time of 30 minutes.
Integration Test (Upgrade Module (Major))
The job running on runner GitHub Actions 418 has exceeded the maximum execution time of 30 minutes.
Integration Test (Distribution Module)
The operation was canceled.
Integration Test (Upgrade Module (Major))
The operation was canceled.
Integration Test (Mint & Staking & Bank Module)
The job running on runner GitHub Actions 423 has exceeded the maximum execution time of 30 minutes.
Integration Test (Mint & Staking & Bank Module)
The operation was canceled.
Integration Test (dApp Tests)
The job running on runner GitHub Actions 128 has exceeded the maximum execution time of 30 minutes.
Integration Test (dApp Tests)
The operation was canceled.
Integration Test (EVM Module)
The job running on runner GitHub Actions 72 has exceeded the maximum execution time of 30 minutes.
Integration Test (EVM Module)
The operation was canceled.
Integration Test (Wasm Module)
The job running on runner GitHub Actions 397 has exceeded the maximum execution time of 30 minutes.
Integration Test (Wasm Module)
The operation was canceled.
Integration Test (SeiDB State Store)
The job running on runner GitHub Actions 178 has exceeded the maximum execution time of 30 minutes.
Integration Test (SeiDB State Store)
The operation was canceled.
Integration Test (Gov & Oracle & Authz Module)
The job running on runner GitHub Actions 290 has exceeded the maximum execution time of 30 minutes.
Integration Test (Gov & Oracle & Authz Module)
The operation was canceled.
Integration Test (Chain Operation Test)
The job running on runner GitHub Actions 160 has exceeded the maximum execution time of 30 minutes.
Integration Test (Chain Operation Test)
The operation was canceled.
Integration Test (Upgrade Module (Minor))
The job running on runner GitHub Actions 402 has exceeded the maximum execution time of 30 minutes.
Integration Test (Upgrade Module (Minor))
The operation was canceled.
Integration Test (SeiDB State Store)
The job running on runner GitHub Actions 243 has exceeded the maximum execution time of 30 minutes.
Integration Test (SeiDB State Store)
The operation was canceled.
Integration Test Check
Final attempt failed. Child_process exited with error code 1
Integration Test Check
Attempt 1 failed. Reason: Child_process exited with error code 1