Skip to content

feat(sbb-sidebar): first draft #23904

feat(sbb-sidebar): first draft

feat(sbb-sidebar): first draft #23904

Triggered via pull request January 8, 2025 15:29
@jeripeierSBBjeripeierSBB
synchronize #3335
sidebar
Status Cancelled
Total duration 15m 57s
Artifacts 1

continuous-integration.yml

on: pull_request
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 4 warnings
integrity
Process completed with exit code 1.
test
Canceling since a higher priority waiting request for 'Continuous Integration-sidebar' exists
test
The operation was canceled.
visual-regression
Canceling since a higher priority waiting request for 'Continuous Integration-sidebar' exists
visual-regression
The operation was canceled.
lint
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
lint: src/elements/sidebar/sidebar/sidebar.ts#L96
Missing return type on function
integrity
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
storybook
2.7 MB