Skip to content

rbayes/Calibration-Operators-Manual

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

58 Commits
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Calibration-Operators-Manual

An update to the calibration operator procedures for SNO+

Suggestions/Issues/Plans

Front Matter, (title page, linked table of contents) needs to be added.

May need to re-assess organisation of sections

2. Controls

  • needs to be updated for the current calibration computer
  • login information (passwords?)
  • manmon (for external systems)

3. Manipulator

  • needs update for hanger/bellows systems
  • external systems (possibly) need to be highlighted
  • double check that the computer system description is up to date

4. Manipulator Geometry

  • Review "Global Coordinate System"
    • are all of the tables complete?
    • are they still correct?
  • Does the context of the global geometry still make sense
    • Going from a UI mounted system to a I-beam mounted system
    • Should calibration system be defined wrt the PSUP
  • Glovebox and UI description should be borrowed from the detector paper (early drafts)

5. Calibration Gas Systems

  • Will need to have some comments about the cover gas system
  • Specifications and UI cover gas monitoring will be required
    • Borrow from the detector paper and the TWiki
  • Plans for URM cover gas required
  • Comments on background mitigations and radon requirements

6. Laser

  • Is the existing documentation sufficient
  • Super Nova Calibration source?

7. Sources

  • Need Scintillator sources (Laserball AmBe, Tagged, Untagged and Cherekov sources)
  • Need external source specifications (AmBe, N16, Laserball)

8. Procedures

  • Should separate Water Only, Scintillator Only, External and Generally applicable procedures into different sections
  • Water Only
    • Mounting procedures
    • Internal N16 deployment
  • External Deployment Procedures (Needs to be brought up to standards)
    • Mounting procedures (to be written)
    • N16
    • AmBe
    • Laserball
  • Scintillator (with adjustments)
    • Mounting procedures
    • Pump/purge procedures
    • Cover gas maintenance
    • Source handling
    • AmBe / Encapsulated deployments (adapted from water)
    • Cherenkov deployment (adapted from water)
    • Laserball deployments (adapted from water)
  • Applicable to all
    • Supernova source
    • DT generator
    • Laser procedures

9. Deployment Records?

  • Would it be worth recording Run numbers, dates, run plans in the operators manual for future reference?
  • Limit to one page summaries

About

The calibration operator procedures for SNO+

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages