Skip to content

chore: improve output messages #148

chore: improve output messages

chore: improve output messages #148

Triggered via push July 3, 2023 07:54
Status Failure
Total duration 1m 12s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

build.yml

on: push
Matrix: lint
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
test (ubuntu-latest, 3.10)
Process completed with exit code 1.
test (ubuntu-latest, 3.8)
The job was canceled because "ubuntu-latest_3_10" failed.
test (ubuntu-latest, 3.8)
Process completed with exit code 1.
test (ubuntu-latest, 3.11)
The job was canceled because "ubuntu-latest_3_10" failed.
test (ubuntu-latest, 3.11)
Process completed with exit code 1.
test (ubuntu-latest, 3.9)
The job was canceled because "ubuntu-latest_3_10" failed.
test (ubuntu-latest, 3.9)
Process completed with exit code 1.
test (ubuntu-latest, 3.7)
The job was canceled because "ubuntu-latest_3_10" failed.
test (ubuntu-latest, 3.7)
The operation was canceled.
lint (ubuntu-latest, 3.11)
Process completed with exit code 1.
lint (ubuntu-latest, 3.9)
The operation was canceled.
lint (ubuntu-latest, 3.10)
The operation was canceled.
lint (ubuntu-latest, 3.8)
The operation was canceled.