Skip to content

Conversation

@isabella-janssen
Copy link
Member

@isabella-janssen isabella-janssen commented Nov 25, 2025

What I did:
This updates the Should properly transition through MCN conditions on rebootless node update test to apply a MC against the master MCP for any cluster where no worker MCP machines exist. Previously, only SNO clusters were treated differently, leading to issues with the test when the two-node fencing tests were turned on.

How to verify:

@openshift-ci-robot
Copy link

Pipeline controller notification
This repository is configured to use the pipeline controller. Second-stage tests will be triggered either automatically or after lgtm label is added, depending on the repository configuration. The pipeline controller will automatically detect which contexts are required and will utilize /test Prow commands to trigger the second stage.

For optional jobs, comment /test ? to see a list of all defined jobs. To trigger manually all jobs from second stage use /pipeline required command.

This repository is configured in: automatic mode

@openshift-ci-robot openshift-ci-robot added jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. labels Nov 25, 2025
@openshift-ci-robot
Copy link

@isabella-janssen: This pull request references Jira Issue OCPBUGS-65970, which is invalid:

  • expected the bug to target the "4.21.0" version, but no target version was set

Comment /jira refresh to re-evaluate validity if changes to the Jira bug are made, or edit the title of this pull request to link to a different bug.

The bug has been updated to refer to the pull request using the external bug tracker.

Details

In response to this:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Nov 25, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Nov 25, 2025

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Nov 25, 2025
@isabella-janssen
Copy link
Member Author

/payload-job periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ovn-two-node-fencing-serial

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Nov 25, 2025

@isabella-janssen: trigger 1 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-metal-ovn-two-node-fencing-serial

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/f52e2a20-ca16-11f0-9a59-0f175180fd13-0

@isabella-janssen
Copy link
Member Author

/jira refresh

@openshift-ci-robot openshift-ci-robot added jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. and removed jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. labels Nov 25, 2025
@openshift-ci-robot
Copy link

@isabella-janssen: This pull request references Jira Issue OCPBUGS-65970, which is valid. The bug has been moved to the POST state.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state New, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @sergiordlr

Details

In response to this:

/jira refresh

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci openshift-ci bot requested a review from sergiordlr November 25, 2025 16:04
@openshift-ci-robot
Copy link

@isabella-janssen: This pull request references Jira Issue OCPBUGS-65970, which is valid.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state POST, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @sergiordlr

Details

In response to this:

What I did:
This updates the Should properly transition through MCN conditions on rebootless node update test to apply a MC against the master MCP for any cluster where no worker MCP machines exist. Previously, only SNO clusters were treated differently, leading to issues with the test when the two-node fencing tests were turned on.

How to verify:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@isabella-janssen
Copy link
Member Author

/payload-job periodic-ci-openshift-release-master-nightly-4.20-e2e-metal-ovn-two-node-fencing-serial periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-1of2 periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-2of2 periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-1of3 periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-2of3 periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-3of3

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 4, 2025

@isabella-janssen: trigger 6 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.20-e2e-metal-ovn-two-node-fencing-serial
  • periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-1of2
  • periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-2of2
  • periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-1of3
  • periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-2of3
  • periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-3of3

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/5bab7270-d0c6-11f0-8c44-8223dd6a90bd-0

@isabella-janssen
Copy link
Member Author

/payload-job periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-1of2 periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-2of2 periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-1of3 periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-2of3 periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-3of3

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 5, 2025

@isabella-janssen: trigger 5 job(s) for the /payload-(with-prs|job|aggregate|job-with-prs|aggregate-with-prs) command

  • periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-1of2
  • periodic-ci-openshift-release-master-nightly-4.21-e2e-aws-ovn-serial-2of2
  • periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-1of3
  • periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-2of3
  • periodic-ci-openshift-release-master-ci-4.21-e2e-aws-ovn-techpreview-serial-3of3

See details on https://pr-payload-tests.ci.openshift.org/runs/ci/d449c1e0-d1fd-11f0-964f-b102bcd0f462-0

@isabella-janssen isabella-janssen marked this pull request as ready for review December 5, 2025 18:47
@isabella-janssen isabella-janssen changed the title (WIP) OCPBUGS-65970: Fix MachineConfigNode test in two-node fencing clusters OCPBUGS-65970: Fix MachineConfigNode test in two-node fencing clusters Dec 5, 2025
@openshift-ci openshift-ci bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Dec 5, 2025
@openshift-ci-robot
Copy link

Scheduling required tests:
/test e2e-aws-csi
/test e2e-aws-ovn-fips
/test e2e-aws-ovn-microshift
/test e2e-aws-ovn-microshift-serial
/test e2e-aws-ovn-serial-1of2
/test e2e-aws-ovn-serial-2of2
/test e2e-gcp-csi
/test e2e-gcp-ovn
/test e2e-gcp-ovn-upgrade
/test e2e-metal-ipi-ovn-ipv6
/test e2e-vsphere-ovn
/test e2e-vsphere-ovn-upi

@isabella-janssen
Copy link
Member Author

/verified by @isabella-janssen

The test fix has been verified by the rehearsal run of the two-node fencing job here and by the required payload rehearsal here.

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Dec 5, 2025
@openshift-ci-robot
Copy link

@isabella-janssen: This PR has been marked as verified by @isabella-janssen.

Details

In response to this:

/verified by @isabella-janssen

The test fix has been verified by the rehearsal run of the two-node fencing job here and by the required payload rehearsal here.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link

@isabella-janssen: This pull request references Jira Issue OCPBUGS-65970, which is valid.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.21.0) matches configured target version for branch (4.21.0)
  • bug is in the state POST, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @sergiordlr

The bug has been updated to refer to the pull request using the external bug tracker.

Details

In response to this:

What I did:
This updates the Should properly transition through MCN conditions on rebootless node update test to apply a MC against the master MCP for any cluster where no worker MCP machines exist. Previously, only SNO clusters were treated differently, leading to issues with the test when the two-node fencing tests were turned on.

How to verify:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@isabella-janssen
Copy link
Member Author

/retest-required

@umohnani8
Copy link
Contributor

/lgtm

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Dec 8, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 8, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: isabella-janssen, umohnani8

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@isabella-janssen
Copy link
Member Author

/label acknowledge-critical-fixes-only

This fix needs to be backported to 4.20 to fix persistent failures of the Should properly transition through MCN conditions on rebootless node update test in the periodic-ci-openshift-release-master-nightly-4.20-e2e-metal-ovn-two-node-fencing-serial job. With no clear timeline on branching and passing rehearsal required payloads this change impacts, this change should be safe to merge now and is important to improving the 4.20 test health.

@openshift-ci openshift-ci bot added the acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. label Dec 8, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Dec 8, 2025

@isabella-janssen: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-merge-bot openshift-merge-bot bot merged commit aa3cdb2 into openshift:main Dec 8, 2025
20 checks passed
@openshift-ci-robot
Copy link

@isabella-janssen: Jira Issue Verification Checks: Jira Issue OCPBUGS-65970
✔️ This pull request was pre-merge verified.
✔️ All associated pull requests have merged.
✔️ All associated, merged pull requests were pre-merge verified.

Jira Issue OCPBUGS-65970 has been moved to the MODIFIED state and will move to the VERIFIED state when the change is available in an accepted nightly payload. 🕓

Details

In response to this:

What I did:
This updates the Should properly transition through MCN conditions on rebootless node update test to apply a MC against the master MCP for any cluster where no worker MCP machines exist. Previously, only SNO clusters were treated differently, leading to issues with the test when the two-node fencing tests were turned on.

How to verify:

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@isabella-janssen isabella-janssen deleted the ocpbugs-65970 branch December 8, 2025 14:58
@openshift-merge-robot
Copy link
Contributor

Fix included in accepted release 4.21.0-0.nightly-2025-12-09-062745

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants