Skip to content

chore: remove lerna #7680

chore: remove lerna

chore: remove lerna #7680

Triggered via pull request December 4, 2024 11:34
Status Failure
Total duration 6h 6m 56s
Artifacts 1

test-all-versions.pr.yml

on: pull_request
parse-labels
21s
parse-labels
Matrix: tav / Run test-all-versions
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 2 warnings
tav / Run test-all-versions (14)
The job running on runner GitHub Actions 367 has exceeded the maximum execution time of 360 minutes.
tav / Run test-all-versions (14)
The operation was canceled.
tav / Run test-all-versions (22)
The job running on runner GitHub Actions 187 has exceeded the maximum execution time of 360 minutes.
tav / Run test-all-versions (22)
The operation was canceled.
tav / Run test-all-versions (18)
The job running on runner GitHub Actions 672 has exceeded the maximum execution time of 360 minutes.
tav / Run test-all-versions (18)
The operation was canceled.
tav / Run test-all-versions (20)
The job running on runner GitHub Actions 977 has exceeded the maximum execution time of 360 minutes.
tav / Run test-all-versions (20)
The operation was canceled.
tav / Run test-all-versions (16)
The job running on runner GitHub Actions 927 has exceeded the maximum execution time of 360 minutes.
tav / Run test-all-versions (16)
The operation was canceled.
parse-labels
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
tav / build-and-cache
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636

Artifacts

Produced during runtime
Name Size
tav-build-cache-7680 Expired
5.64 MB