Add change management section to regulatory docs #2833

Merged
merged 10 commits into from
Oct 30, 2024
34 changes: 23 additions & 11 deletions sites/docs/src/content/docs/guidelines/regulatory/overview.md
Original file line number Diff line number Diff line change
Expand Up @@ -23,9 +23,9 @@ Risk based validation is considering everything around the development, implemen
This then has to be mitigated using appropriate measures.
An example would be that a pipeline per se has the risk of failing execution, which is a risk of it not producing desired outcome and which can be mitigated using appropriate functional tests using [nf-test](https://www.nf-test.com/) for example.

[!WARNING]
> [!WARNING]
> While nf-core can provide users with guidelines, information and help to validate pipelines, we will not be able to provide you with a full validation report that you can simply take "off the shelf" and use for your regulatory needs.

While nf-core can provide users with guidelines, information and help to validate pipelines, we will not be able to provide you with a full validation report that you can simply take "off the shelf" and use for your regulatory needs.
The report that nf-core will be able to create for you [soon](https://github.com/nf-core/tools/issues/3258) will however contain a lot of the basic information required for running a full validation.

> We are working on a proof of concept validation for one nf-core pipeline (rnaseq) to showcase what needs to be done and where are potential gaps within the nf-core guidelines, processes or tooling that we can then hopefully address.
Expand Down Expand Up @@ -113,7 +113,19 @@ Make sure you rerun the appropriate levels of testing depending on the potential

#### Change Management

- PR/code review and approval (change management)
In software development, change management refers to the process of tracking and controlling modifications to code and documentation throughout the _software development lifecycle_, ensuring transparency, accountability, and risk mitigation. In regulated bioinformatics environments, change management practices are essential for maintaining compliance, and reproducibility. Within nf-core pipelines, change management is structured as follows:

- Requests for changes, bug reports, and enhancement suggestions can be submitted by any user or community member, ensuring transparent and open community-driven improvement.
- Each pipeline and module follows a Pull Request (PR) template checklist, which helps contributors meet minimum submission requirements.
- Proposed changes must include system and unit tests, which are automatically validated through the continuous integration/continuous deployment (CI/CD) framework, reducing manual testing overhead.
- Changes to development branches require peer review, with each PR needing at least one review before merging into dev branches and at least two reviews before merging into the _main_ branch.
- Automated tests are triggered on each PR to confirm that existing functionality remains unaffected.
- Automated linting checks are performed on each PR, enforcing coding standards and preventing stylistic issues.
- Direct changes to the main branch are not permitted, protecting the integrity of the production-ready code.
- During pipeline release, reviewers must verify that the pipeline adheres to nf-core’s central principles (such as reproducibility, thorough documentation, and compliance with the nf-core template). Any new pipeline submission requires approval from the nf-core core team before integration into the nf-core repository.

**Do I need to re-validate my pipeline every time a change is made?**
In a validated environment, the Risk Assessment process will determine the level of testing required for each change. Minor or non-impactful changes may require testing related to the specific component but major changes may require broader re-validation. Significant changes to the entire pipeline would need a complete re-validation to ensure compliance and integrity.

#### Security

Expand Down Expand Up @@ -168,14 +180,14 @@ Pipeline level:
- Compare the performance of the test system in your dataset with those
specifications defined by the user. This includes the following performance
characteristics:
• Accuracy
• Precision
• Reportable range [if applicable]
• Reference intervals/range (normal values) for the laboratory’s patient population [if applicable]
- Controls to be included to unit tests: [if applicable]
• Positive control
• Negative control
• Additional controls (for example PCR reagent controls, amplification control gene, calibration curve,... )
• Accuracy
• Precision
• Reportable range [if applicable]
• Reference intervals/range (normal values) for the laboratory’s patient population [if applicable]
- Controls to be included to unit tests: [if applicable]
• Positive control
• Negative control
• Additional controls (for example PCR reagent controls, amplification control gene, calibration curve,... )
- Set of expected results for all controls.
- Set assay acceptance criteria
- Set rejection criteria.