Skip to content

WIP jenkins pipeline: get rid of path in the final zip #32

WIP jenkins pipeline: get rid of path in the final zip

WIP jenkins pipeline: get rid of path in the final zip #32

Triggered via push December 26, 2023 21:48
Status Failure
Total duration 6h 0m 23s
Artifacts
Fit to window
Zoom out
Zoom in

Annotations

2 errors
build
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
build
The operation was canceled.