Skip to content

Merge pull request #1805 from triska/master #54

Merge pull request #1805 from triska/master

Merge pull request #1805 from triska/master #54

Triggered via push May 15, 2023 05:27
Status Failure
Total duration 6h 0m 13s
Artifacts 4

ci.yml

on: push
Matrix: build-test
logtalk-test
0s
logtalk-test
Fit to window
Zoom out
Zoom in

Annotations

2 errors, 3 warnings, and 1 notice
build-test (ubuntu-20.04, beta, bash)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
build-test (ubuntu-20.04, beta, bash)
The operation was canceled.
44 tests found
There are 44 tests, see "Raw output" for the full list of tests.
build-test (ubuntu-20.04, stable, bash, true)
cargo clippy found some code style changes that may be more idiomatic
build-test (ubuntu-20.04, stable, bash, true)
cargo fmt found some formatting changes that may improve readability
build-test (ubuntu-20.04, beta, bash)
Failed to restore: The operation cannot be completed in timeout.

Artifacts

Produced during runtime
Name Size
cargo-test-results Expired
4.64 KB
scryer-prolog_macos-11 Expired
12.3 MB
scryer-prolog_ubuntu-20.04 Expired
129 MB
scryer-prolog_windows-latest Expired
141 MB