Skip to content

fix: env (hopefully) #5

fix: env (hopefully)

fix: env (hopefully) #5

Triggered via push May 19, 2024 16:21
Status Failure
Total duration 6h 8m 16s
Artifacts

CD.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

2 errors
build (20.13.1)
The job running on runner anteraja has exceeded the maximum execution time of 360 minutes.
build (20.13.1)
The operation was canceled.