Skip to content

v201:call,call_result,datatypes: complete and corrected type annotations #610

v201:call,call_result,datatypes: complete and corrected type annotations

v201:call,call_result,datatypes: complete and corrected type annotations #610

Re-run triggered December 8, 2024 17:15
Status Failure
Total duration 37s
Artifacts

pull-request.yml

on: pull_request
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 1 warning
tests (3.11)
Process completed with exit code 2.
tests (3.8)
The job was canceled because "_3_11" failed.
tests (3.8)
Process completed with exit code 2.
tests (3.9)
The job was canceled because "_3_11" failed.
tests (3.9)
Process completed with exit code 2.
tests (3.12)
The job was canceled because "_3_11" failed.
tests (3.12)
The operation was canceled.
tests (3.10)
The job was canceled because "_3_11" failed.
tests (3.10)
The operation was canceled.
tests (3.13)
The job was canceled because "_3_11" failed.
tests (3.11)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636