-
Notifications
You must be signed in to change notification settings - Fork 121
Pull requests: metal3-io/metal3-dev-env
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
WIP: cleanup and reformat bash syntax in 04 script
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#1482
opened Dec 11, 2024 by
tuminoid
Loading…
Default to quay.io for image hub and registry image
needs-rebase
Indicates that a PR cannot be merged because it has merge conflicts with HEAD.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1473
opened Nov 22, 2024 by
elfosardo
Loading…
⚠️ Change the way IPAM is deployed with CAPM3 and Test changes made in IPAM and CAPM3 together
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#1459
opened Sep 23, 2024 by
peppi-lotta
Loading…
🌱 Take Deploy-cli to replace deploy.sh
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1447
opened Aug 13, 2024 by
mquhuy
Loading…
Make minikube the default ephemeral cluster
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1404
opened May 20, 2024 by
kashifest
Loading…
ProTip!
Mix and match filters to narrow down what you’re looking for.