🌱 Bump sigs.k8s.io/controller-runtime from 0.19.1 to 0.19.2 in /test #1119
Triggered via pull request
November 24, 2024 21:06
Status
Cancelled
Total duration
18m 0s
Artifacts
–
pipeline.yml
on: pull_request
Matrix: golangci-lint / lint
unit
/
unit
2m 17s
e2e-fixture-test
/
E2E fixture test
14m 48s
Matrix: e2e-test
Annotations
5 errors
e2e-test (redfish-virtualmedia) / E2E test
No files were found with the provided path: test/e2e/_artifacts. No artifacts will be uploaded.
|
e2e-test (redfish-virtualmedia) / E2E test
Process completed with exit code 90.
|
e2e-test (ipmi) / E2E test
FailFast: cancelling since parallel instance has failed
|
e2e-test (ipmi) / E2E test
The operation was canceled.
|
e2e-fixture-test / E2E fixture test
Process completed with exit code 2.
|