Skip to content

prep 0.1

prep 0.1 #26

Triggered via pull request October 10, 2023 01:50
Status Cancelled
Total duration 11m 32s
Artifacts

ci.yml

on: pull_request
Matrix: Build
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 1 notice
Build (macos-latest, 5.1.x)
Canceling since a higher priority waiting request for 'CI-refs/pull/4/merge' exists
Build (macos-latest, 5.1.x)
The operation was canceled.
Build (ubuntu-latest, 5.1.x)
Canceling since a higher priority waiting request for 'CI-refs/pull/4/merge' exists
Build (ubuntu-latest, 5.1.x)
The operation was canceled.
Build (ubuntu-latest, 5.1.x)
An error has been caught in some system package index files, so the system package index files have been re-synchronised, and the system package installation has been retried: the process '/usr/bin/sudo' failed with exit code 100