Skip to content

change data structure #6

change data structure

change data structure #6

Triggered via push January 17, 2024 03:54
Status Failure
Total duration 20s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.9)
Process completed with exit code 30.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 30.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
Process completed with exit code 30.
build (3.8)
The job was canceled because "_3_9" failed.
build (3.8)
Process completed with exit code 30.