Technology is being developed at increasing speeds. In the software industry, this is apparent with
entire companies being built around new technology seemingly every day and running their entire
life-cycle within a few years. With the world going faster and faster, I have not paused to take a
step back and think about what technology is or what it's role is.
Technology in the software industry is being developed at increasing speeds. Entire companies run
their entire life-cycle within a few years. With the world going faster and faster, it seems
challenging to pause and take a step back to think about what technology is or what it's role is in
society.

_Technology_ is defined as "the practical application of research and science to develop new
solutions that could subsequently be taken into commercial application through a product or
service" (Flinn p.5). The "tech industry" is the entire industry where research and science is being
applied to develop new solutions. Generative AI is definitely in the tech industry, and so is mRNA,
CO2-based heat pumps, and solid-state batteries. While I do work in the tech industry, it might be
more correct to say the software industry.
solutions that could subsequently be taken into commercial application through a product or service"
(Flinn p.5). While I do work in the "tech industry", I often forget that the tech industry expands
far beyond my little corner in software. The "tech industry" is the entire industry where research
and science is being applied to develop new solutions. Generative AI is definitely in the tech
industry, and so is mRNA, CO2-based heat pumps, and solid-state batteries.

Product development is the process in which technology is turned into a commercial product or
Product development is the process in which technologies are turned into a commercial product or
service. How do we know when a technology is sufficiently ready to be turned into a product? Some
might say as soon as someone is willing to pay for it, but this leaves out a whole slew of
testing and safety considerations. It also leaves out one of the more important business questions:
"How do we know which of the technologies are the most promising (ie. best return for the
organization)?"
might say as soon as someone is willing to pay for it, but this leaves out a whole slew of testing
and safety considerations. It also leaves out one of the more important business questions: "How do
we know which of the technologies are the most promising (ie. best return for the organization)?"

Fortunately, one of the great innovators of the 20th century has built a guide in determining the
readiness of technology. These readiness levels help measure technologies against themselves in
order to monitor their progress as well as measure against other competing technologies to determine
which technology has the best return. NASA developed Technology Readiness Levels to capture this
data (_Technology Readiness Levels - NASA_).
Fortunately for us, one of the great innovators of the 20th century has built a guide in determining
the readiness of technology. These readiness levels help measure technologies against themselves in
order to monitor their progress in development. They are also used to measure against other
competing technologies to determine and prioritize the projects that has the best chance of success.
NASA developed Technology Readiness Levels to capture this data (_Technology Readiness Levels -
NASA_).

| Level | Description |
| ----- | ----------- |
Expand All @@ -42,15 +42,16 @@ data (_Technology Readiness Levels - NASA_).
| TRL 8 | Actual system completed and "flight qualified" through test and demonstration (ground or space) |
| TRL 9 | Actual system "flight proven" through successful mission operations |

While specific to an aerospace flight vehicle, the differences between the levels helps extrapolate
TRLs to other industries. A light-weight system can then be built around these levels to ensure that all
criteria has been met to achieve each level before investing too heavily into the next ones. [Part
4]() will go into more detail on such a system.
While specific to aerospace flight vehicles, the differences between levels helps extrapolate TRLs
to other industries. A light-weight gate review system can then be built around these levels to
ensure that all criteria has been met to achieve each level before investing too heavily into the
next ones. [Part 4]() will go into more detail on such a system.

It is helpful to expand each of the description definitions along multiple dimensions to make sure
that the correct level is assigned at any given review. These definitions could be unique to every
organization depending on what product or services they provide. Staying in the physical engineering
realm, such an expansion could look like the following (Weber, 2024):
It is helpful to expand each of the description definitions along multiple categories. This makes
sure that the same definitions are used when assigning an overall level at a gate review. These
definitions could be unique to every organization, depending on what product or services they
provide. Staying in the physical engineering realm, such an expansion could look like the following
(Weber, 2024):

| Level | Product Definition | Form of Physical Realization | Technical Requirements | Testing & Validation | Regulatory Approval | Phase |
| ----- | ------------------ | ---------------------------- | ---------------------- | -------------------- | ------------------- | ----- |
Expand All @@ -65,12 +66,12 @@ realm, such an expansion could look like the following (Weber, 2024):
| TRL 9 | | Made off tools in final production process | Final product/process fully qualified | | Full regulatory approval; Qualified specs & standards | Deployment |

At any one time, the technology may be at different levels across these categories. The overall
Technology Readiness Level is the minimum achieved across all categories. For example, if we were
reviewing a new technology that had a TRL 7 in _Product Definition_ but a TRL 2 in _Testing &
Validation_, the overall TRL of the technology would be a TRL 2.
TRL of the project is the minimum achieved across all categories. For example, if we were reviewing
a new technology that had a TRL 7 in _Product Definition_ but a TRL 2 in _Testing & Validation_ (and
all other TRLs were greater than 2), the overall TRL of the technology would be a TRL 2.

These level definitions have a heavy skew towards physical engineering. Lucky for us, NASA also
develops software and has adapted their original TRLs to the software world (_Software Technology
These level definitions have a heavy skew towards physical engineering. But lucky for us, NASA also
develops software and has adapted their original TRLs to software engineering (_Software Technology
Readiness Levels - NASA_):

| Level | Software Description |
Expand All @@ -85,32 +86,54 @@ Readiness Levels - NASA_):
| TRL 8 | All software has been thoroughly debugged and fully integrated with all operational hardware and software systems. All user documentation, training documentation, and maintenance documentation completed. All functionality successfully demonstrated in simulated operational scenarios. Verification and Validation (V&V) completed. |
| TRL 9 | All software has been thoroughly debugged and fully integrated with all operational hardware/software systems. All documentation has been completed. Sustaining software engineering support is in place. System has been successfully operated in the operational environment. |

All software technology _projects_ need to go through all TRLs (anything at the task level should be
governed by other processes that reinforce these levels). However, not all levels need to be done by
the same organization. For instance, a company doesn't need to start from TRL 1 when purchasing and
rolling out a payroll software from a vendor. However, the TRL of the rollout will probably be lower
than the vendor's internal TRL until the software has been fully demoed and rolled for the entire
workforce. From another perspective, if a company is building custom software in-house as a product,
some of the projects may need to start all the way at TRL 1 and work up through TRL 9.
All software technology _projects_ need to meet all TRLs (anything at the task level should be
governed by other processes that reinforce these levels). If a company is building custom software
in-house as a product, some projects may need to start at TRL 1 and work up through TRL 9. However,
not all levels need to be done by the same organization. For instance, a company doesn't need to
start from TRL 1 when purchasing and rolling out a payroll software from a vendor. The architecture
and algorithms have already been figured out. However, the TRL of the project for the purchasing
company may be lower than the vendor's internal TRL for the product. The purchasing company needs to
integrate it into their business systems and validate that the product will work for them. Once the
payroll software is fully operational across the workforce, it may then be considered a TRL 9 for
the purchasing company.

As mentioned in [Part 1](./posts/0064-engineering-portfolio-management-part1), my career has been in
the Software-as-a-Service industry and in Cloud Operations. Both of these areas are relatively new
compared to other industries like the food, aerospace, or steel industries. It seems we are in our
adolescence, where we think we know better than our parent engineering industries, but are still
learning what works and what does not.
adolescence, where we think we know better than the engineering industries that have come before.
But we are still learning what works and what does not.

While I advocated for DevOps methodologies and building the capabilities for failing fast forward,
it seems that some of the approaches adopted have cut the TRL corners. "Fail fast" has become a
motto and badge of honor in the software industry. However, the original idea seems to have lost its
While I advocate for DevOps methodologies and building the capabilities for failing fast forward,
it seems that some of the approaches adopted have cut TRL corners. "Fail fast" has become a
motto and badge of honor in the software industry. But the original idea seems to have lost its
efficacy. It seems to have become an excuse to not to do the upfront legwork to validate ideas
before building them. If the user likes a new feature, "Great! Let's keep it". If they don't, it may
or may not be removed, but no harm no foul. It is just a bunch of intangible ones and zeros, so it
is hard to say what the feature actually is worth in effort and in value to the company.

Failing fast needs to get back to failing early in the TRL levels rather than after the technology
has been fully implemented. While learning after the fact is good, it is better to learn prior to
the bulk of the financial investment in TRL 7-9. This will become more apparent with the gate review
system that we'll discuss in [Part 4]().
before building them.

It seems that the intangibility of software makes it look like writing software is cheap. It might
take five minutes to write these three lines of code and five days to write another three other
lines of code. The end product in both cases is three lines of code but the impact may be completely
different: an html button with a new hover state versus statistical analysis monitoring algorithm to
determine the failure state of a dam generator.

Dr. Ali published a book this year correlating the use of Agile project management with increased
risk of project failure (Ali, p.311). His main thesis was that too often teams jump right into
building something rather than taking time to define the problem and plan. While I am waiting for
follow-up studies to be done in relation to Agile and project failure rates, I have also observed
(and participated in) the behavior of jumping to code instead of designing and planning requirements
and specifications.

We can see this behavior in building new software features without the voice of the customer.
Features are built and rolled out and then A/B tested. If the user likes a new feature, "Great!
Let's keep it". If they don't, it may get removed (or sometimes it will be left in the product since
there is another feature that is a higher priority than removing the unwanted one). A/B testing is
useful for low cost changes (button color changes, etc), but with significant changes, a lot more
planning and validation is needed.

Failing fast needs to get back to failing early in the TRL levels rather than in TRL 9 after the
technology has been fully implemented and deployed to production. While learning after the fact is
valuable, it is better to learn prior to the significant financial investment in TRL 7-9. The gate
review system that will be discussed in [Part 4]() will provide a process to fail fast in a reliable
way.

---

Expand All @@ -120,6 +143,5 @@ system that we'll discuss in [Part 4]().
2. Technology Readiness Levels - NASA. 27 Sept. 2023, https://www.nasa.gov/directorates/somd/space-communications-navigation-program/technology-readiness-levels/.
3. Weber, Gary. TRL/MRL Categories. Gonzaga University, ENGM 510.
4. Software Technology Readiness Levels - NASA. https://www.nasa.gov/wp-content/uploads/2017/12/458490main_trl_definitions.pdf.


5. Ali, Junade. Impact Engineering (Complete Omnibus). First edition, Engprax Ltd, 2024.