Skip to content

Merge pull request #9 from mrdoob/dev #6

Merge pull request #9 from mrdoob/dev

Merge pull request #9 from mrdoob/dev #6

Triggered via push September 1, 2023 03:32
Status Failure
Total duration 28m 3s
Artifacts 1

ci.yml

on: push
Lint testing
39s
Lint testing
Unit testing
38s
Unit testing
Examples ready for release
41s
Examples ready for release
Matrix: E2E testing
Fit to window
Zoom out
Zoom in

Annotations

16 errors
E2E testing (ubuntu-latest, 3)
Process completed with exit code 5.
E2E testing (ubuntu-latest, 0)
Process completed with exit code 3.
E2E testing (ubuntu-latest, 2)
Process completed with exit code 16.
E2E testing (ubuntu-latest, 1)
Process completed with exit code 10.
Examples ready for release
Process completed with exit code 1.
Lint testing: src/extras/PMREMGenerator.js#L149
There must be a space before this paren
Lint testing
Process completed with exit code 1.
E2E testing (windows-latest, 0)
Process completed with exit code 1.
E2E testing (windows-latest, 1)
Process completed with exit code 1.
E2E testing (macos-latest, 1)
Process completed with exit code 10.
E2E testing (windows-latest, 2)
Process completed with exit code 1.
E2E testing (windows-latest, 3)
Process completed with exit code 1.
E2E testing (macos-latest, 0)
Process completed with exit code 3.
E2E testing (macos-latest, 3)
Process completed with exit code 5.
E2E testing (macos-latest, 2)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 20 minutes.
E2E testing (macos-latest, 2)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
Output screenshots Expired
9.94 MB