Skip to content

Merge pull request #45 from go-co-op/dependabot/go_modules/gorm.io/dr… #104

Merge pull request #45 from go-co-op/dependabot/go_modules/gorm.io/dr…

Merge pull request #45 from go-co-op/dependabot/go_modules/gorm.io/dr… #104

Triggered via push December 5, 2024 18:08
Status Failure
Total duration 22s
Artifacts

go_test.yml

on: push
Matrix: lint and test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
lint and test (1.22)
golangci-lint exit with code 5
lint and test (1.21)
The job was canceled because "_1_22" failed.
lint and test (1.21)
golangci-lint exit with code 5
lint and test (1.20)
The job was canceled because "_1_22" failed.
lint and test (1.20)
The operation was canceled.
lint and test (1.22)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636