Skip to content

gh-234: add pre-commit.ci support #321

gh-234: add pre-commit.ci support

gh-234: add pre-commit.ci support #321

Triggered via pull request September 18, 2024 15:39
Status Failure
Total duration 1m 40s
Artifacts

test.yml

on: pull_request
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Tests (3.9)
Process completed with exit code 1.
Tests (3.12)
The job was canceled because "_3_9" failed.
Tests (3.12)
The operation was canceled.
Tests (3.11)
The job was canceled because "_3_9" failed.
Tests (3.11)
The operation was canceled.
Tests (3.8)
The job was canceled because "_3_9" failed.
Tests (3.8)
The operation was canceled.