gh-231: add ruff
linting to pre-commit
#317
Triggered via pull request
September 18, 2024 15:34
Status
Cancelled
Total duration
1m 41s
Artifacts
–
test.yml
on: pull_request
Build
10s
Docs
1m 28s
Matrix: Tests
Annotations
8 errors
Tests (3.9)
Process completed with exit code 1.
|
Tests (3.10)
The job was canceled because "_3_9" failed.
|
Tests (3.8)
The job was canceled because "_3_9" failed.
|
Tests (3.8)
The operation was canceled.
|
Tests (3.12)
The job was canceled because "_3_9" failed.
|
Tests (3.12)
The operation was canceled.
|
Docs
Canceling since a higher priority waiting request for 'Test-refs/pull/232/merge' exists
|
Docs
Process completed with exit code 2.
|