Updating: very very minorly #2596
main.yml
on: push
build-and-test-cygwin
2m 1s
build-and-test-msys2
2m 6s
build-and-test-linux
1m 48s
build-and-test-macos
17s
Annotations
5 errors and 2 warnings
build-and-test-macos
Process completed with exit code 77.
|
build-and-test-linux
Process completed with exit code 2.
|
build-and-test-cygwin
Canceling since a higher priority waiting request for 'Build and Test ATS3 @ refs/heads/master' exists
|
build-and-test-msys2
Canceling since a higher priority waiting request for 'Build and Test ATS3 @ refs/heads/master' exists
|
build-and-test-msys2
The operation was canceled.
|
build-and-test-macos
gcc 14.2.0_1 is already installed and up-to-date.
To reinstall 14.2.0_1, run:
brew reinstall gcc
|
build-and-test-macos
gmp 6.3.0 is already installed and up-to-date.
To reinstall 6.3.0, run:
brew reinstall gmp
|