Skip to content

chore(deps): update dependency eslint to v9 #40468

chore(deps): update dependency eslint to v9

chore(deps): update dependency eslint to v9 #40468

Triggered via pull request August 28, 2024 20:42
Status Cancelled
Total duration 2m 40s
Artifacts 2

continuous-integration.yml

on: pull_request
api-check-needed
4s
api-check-needed
e2e-check-needed
4s
e2e-check-needed
Lint: Frontend (ESLint)
33s
Lint: Frontend (ESLint)
Lint: ClientPrint (ESLint)
22s
Lint: ClientPrint (ESLint)
Lint: Print (ESLint)
29s
Lint: Print (ESLint)
Tests: API
0s
Tests: API
Lint: API (php-cs-fixer)
0s
Lint: API (php-cs-fixer)
Tests: End-to-end build  /  Tests: End-to-end (build job)
1m 13s
Tests: End-to-end build / Tests: End-to-end (build job)
Lint: e2e (ESLint)
29s
Lint: e2e (ESLint)
Finish coveralls report
0s
Finish coveralls report
Matrix: Tests: End-to-end run / Tests: End-to-end
workflow-success
1s
workflow-success
Send out CI success event
0s
Send out CI success event
Fit to window
Zoom out
Zoom in

Annotations

17 errors and 13 warnings
Lint: Frontend (ESLint): frontend/src/plugins/store/preferences.js#L16
'error' is defined but never used
Lint: Frontend (ESLint)
Process completed with exit code 1.
Tests: Frontend
Canceling since a higher priority waiting request for 'CI (mandatory checks)-pull_request-5155/merge' exists
Tests: Frontend
Process completed with exit code 1.
Tests: End-to-end run / Tests: End-to-end (chrome)
Canceling since a higher priority waiting request for 'CI (mandatory checks)-pull_request-5155/merge' exists
Tests: End-to-end run / Tests: End-to-end (chrome)
The operation was canceled.
Tests: End-to-end run / Tests: End-to-end (edge)
Canceling since a higher priority waiting request for 'CI (mandatory checks)-pull_request-5155/merge' exists
Tests: End-to-end run / Tests: End-to-end (edge)
The operation was canceled.
Tests: End-to-end run / Tests: End-to-end (firefox)
Canceling since a higher priority waiting request for 'CI (mandatory checks)-pull_request-5155/merge' exists
Tests: End-to-end run / Tests: End-to-end (firefox)
The operation was canceled.
workflow-success
Job frontend-eslint failed with status failure
workflow-success
Job frontend-tests failed with status cancelled
workflow-success
Job e2e-tests-run failed with status cancelled
Lint: Frontend (ESLint): frontend/src/components/activity/content/layout/ContentNodeCard.vue#L157
Need to pass argument to the `::v-deep` pseudo-element
Tests: End-to-end run / Tests: End-to-end (chrome)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Tests: End-to-end run / Tests: End-to-end (edge)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.
Tests: End-to-end run / Tests: End-to-end (firefox)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
e2e-tests-images
225 MB
ecamp~ecamp3~Z4QN53.dockerbuild
68.5 KB