Skip to content

chore(deps): Bump home from 0.5.9 to 0.5.11 (#909) #900

chore(deps): Bump home from 0.5.9 to 0.5.11 (#909)

chore(deps): Bump home from 0.5.9 to 0.5.11 (#909) #900

Triggered via push December 24, 2024 02:39
Status Failure
Total duration 10h 0m 31s
Artifacts

docker.yml

on: push
Push Client Image
1h 12m
Push Client Image
Push Dfinit Image
10h 0m
Push Dfinit Image
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 1 warning
Push Dfinit Image
The job running on runner large-runner-1 has exceeded the maximum execution time of 600 minutes.
Push Dfinit Image
The operation was canceled.
Push Client Image
Failed to export build record: /tmp/runner/large-runner-2/_temp/docker-actions-toolkit-a2VxE5/export/rec.dockerbuild not found