dracut.sh: add --sbat option to add sbat policy to UKI #2056
integration.yml
on: pull_request
Matrix: network
Matrix: openrc-musl
Matrix: test
Annotations
10 errors
network (fedora:latest, network-legacy, 20)
Process completed with exit code 2.
|
test (fedora:latest, 12)
Process completed with exit code 2.
|
test (opensuse:latest, 13)
Process completed with exit code 2.
|
test (opensuse:latest, 14)
Process completed with exit code 2.
|
test (opensuse:latest, 03)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 30 minutes.
|
test (opensuse:latest, 03)
The operation was canceled.
|
test (opensuse:latest, 15)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 30 minutes.
|
test (opensuse:latest, 15)
The operation was canceled.
|
network (fedora:latest, network-manager, 40)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 45 minutes.
|
network (fedora:latest, network-manager, 40)
The operation was canceled.
|