Skip to content

Tests

Tests #1094

Triggered via schedule September 12, 2023 07:09
Status Failure
Total duration 16h 48m 19s
Artifacts 14

ispc-ci.yml

on: schedule
define-flow
0s
define-flow
linux-build-ispc-llvm15
7m 1s
linux-build-ispc-llvm15
linux-build-ispc-llvm13
7m 56s
linux-build-ispc-llvm13
linux-build-ispc-llvm14
7m 7s
linux-build-ispc-llvm14
linux-build-ispc-llvm15-release
6m 21s
linux-build-ispc-llvm15-release
linux-build-ispc-llvm16
7m 38s
linux-build-ispc-llvm16
macos-build-ispc-llvm15
11m 15s
macos-build-ispc-llvm15
macos-build-ispc-llvm16
11m 55s
macos-build-ispc-llvm16
win-build-ispc-llvm13
13m 11s
win-build-ispc-llvm13
win-build-ispc-llvm14
15m 27s
win-build-ispc-llvm14
win-build-ispc-llvm15
14m 34s
win-build-ispc-llvm15
win-build-ispc-llvm16
15m 55s
win-build-ispc-llvm16
linux-test-debug-llvm15
48m 23s
linux-test-debug-llvm15
Matrix: linux-test-llvm15
linux-test-llvm13
19m 15s
linux-test-llvm13
Matrix: linux-test-llvm14
linux-test-llvm15-release
33m 21s
linux-test-llvm15-release
Matrix: linux-test-llvm16
macos-test-ispc-llvm15
14m 39s
macos-test-ispc-llvm15
macos-test-ispc-llvm16
15m 57s
macos-test-ispc-llvm16
Matrix: win-test-llvm13
Matrix: win-test-llvm14
Matrix: win-test-llvm15
Matrix: win-test-llvm16
Fit to window
Zoom out
Zoom in

Annotations

15 errors
win-test-llvm15 (x86-64, avx1-i32x16)
Process completed with exit code 1.
win-test-llvm15 (x86, avx1-i32x16)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
win-test-llvm15 (x86, avx1-i32x16)
The operation was canceled.
win-test-llvm15 (x86, avx1-i32x8)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 360 minutes.
win-test-llvm15 (x86, avx1-i32x8)
The operation was canceled.
win-test-llvm15 (x86, avx1-i32x4)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
win-test-llvm15 (x86, avx1-i32x4)
The operation was canceled.
win-test-llvm15 (x86, avx1-i64x4)
The job running on runner GitHub Actions 13 has exceeded the maximum execution time of 360 minutes.
win-test-llvm15 (x86, avx1-i64x4)
The operation was canceled.
win-test-llvm16 (x86, avx1-i32x8)
Process completed with exit code 1.
win-test-llvm16 (x86, avx1-i32x16)
Process completed with exit code 1.
win-test-llvm16 (x86, avx1-i32x4)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
win-test-llvm16 (x86, avx1-i32x4)
The operation was canceled.
win-test-llvm16 (x86, avx1-i64x4)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
win-test-llvm16 (x86, avx1-i64x4)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
fail_db.llvm15.x86-64.avx1-i32x16.txt Expired
5.59 KB
fail_db.llvm16.x86.avx1-i32x16.txt Expired
5.89 KB
fail_db.llvm16.x86.avx1-i32x8.txt Expired
5.91 KB
ispc_llvm13_linux Expired
41.2 MB
ispc_llvm13_win Expired
41.4 MB
ispc_llvm14_linux Expired
41.9 MB
ispc_llvm14_win Expired
43 MB
ispc_llvm15_linux Expired
42.7 MB
ispc_llvm15_macos Expired
69 MB
ispc_llvm15_win Expired
43.8 MB
ispc_llvm15rel_linux Expired
38.4 MB
ispc_llvm16_linux Expired
43.4 MB
ispc_llvm16_macos Expired
71.1 MB
ispc_llvm16_win Expired
44.5 MB