Skip to content

[PERFSCALE-2466]: Updates to the Multi-Arch perfApp (#4) #11

[PERFSCALE-2466]: Updates to the Multi-Arch perfApp (#4)

[PERFSCALE-2466]: Updates to the Multi-Arch perfApp (#4) #11

Triggered via push September 29, 2023 07:59
Status Failure
Total duration 1m 7s
Artifacts

ci.yml

on: push
Matrix: build-master
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build-master (1.19, amd64)
Process completed with exit code 2.
build-master (1.19, ppc64le)
The job was canceled because "_1_19_amd64" failed.
build-master (1.19, ppc64le)
Process completed with exit code 2.
build-master (1.19, s390x)
The job was canceled because "_1_19_amd64" failed.
build-master (1.19, s390x)
Process completed with exit code 2.
build-master (1.19, arm64)
The job was canceled because "_1_19_amd64" failed.
build-master (1.19, arm64)
The operation was canceled.