Skip to content

Jenkins agent minimal working charm #33

Jenkins agent minimal working charm

Jenkins agent minimal working charm #33

Triggered via pull request December 14, 2023 18:43
Status Cancelled
Total duration 24m 55s
Artifacts 1

integration_test.yaml

on: pull_request
integration-tests  /  ...  /  Get runner image
3s
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
4s
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
12s
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
1m 29s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Matrix: integration-tests / Build rock / Build rock
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

5 errors
integration-tests / Build and push charm
Canceling since a higher priority waiting request for 'operator-workflows-Integration tests-integration-tests-refs/pull/4/merge-integration' exists
integration-tests / Build and push charm
The operation was canceled.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
Unable to find any artifacts for the associated workflow

Artifacts

Produced during runtime
Name Size
jenkins-agent-images Expired
1 Byte