Skip to content

[DPE-5150] Adding Spark-4.0.0-preview1 #363

[DPE-5150] Adding Spark-4.0.0-preview1

[DPE-5150] Adding Spark-4.0.0-preview1 #363

Triggered via pull request August 14, 2024 16:26
@welpaolowelpaolo
synchronize #103
dpe-5150
Status Cancelled
Total duration 23m 59s
Artifacts 1

integration.yaml

on: pull_request
build-rock  /  lint
5s
build-rock / lint
Matrix: integration
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration (integration, 1.29/stable)
Process completed with exit code 2.
integration (integration, 1.30/beta)
Process completed with exit code 2.
integration (integration, 1.28/stable)
Canceling since a higher priority waiting request for 'Spark Image Tests-refs/pull/103/merge' exists
integration (integration, 1.28/stable)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
charmed-spark Expired
2 GB