Skip to content

Update Netlify configuration (#824) #2006

Update Netlify configuration (#824)

Update Netlify configuration (#824) #2006

Triggered via push January 2, 2024 05:10
Status Failure
Total duration 5m 19s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

3 errors
build (3.0.0)
Process completed with exit code 1.
build (3.3.0)
The job was canceled because "_3_0_0" failed.
build (3.3.0)
The operation was canceled.