build: 📦 nx monorepo to v20.5.0 #726
pr.yml
on: pull_request
Matrix: pr-test / unit-test
Check commit message follows guidelines
13s
Check files changes follow guidelines
12s
Matrix: pr-e2e-test / e2e-test
Matrix: Backwards compatibility test / Backwards Compatibility Test
Waiting for pending jobs
Annotations
18 errors
Check files changes follow guidelines
Process completed with exit code 1.
|
Check commit message follows guidelines
Process completed with exit code 1.
|
pr-test / unit-test (ubuntu-latest, 20)
Process completed with exit code 1.
|
pr-test / build
Process completed with exit code 1.
|
pr-test / lint
Process completed with exit code 1.
|
pr-test / unit-test (ubuntu-latest, 22)
The operation was canceled.
|
pr-test / unit-test (ubuntu-latest, 22)
The strategy configuration was canceled because "pr-test.unit-test.ubuntu-latest_20" failed
|
pr-test / unit-test (windows-latest, 20)
The operation was canceled.
|
pr-test / unit-test (windows-latest, 20)
The strategy configuration was canceled because "pr-test.unit-test.ubuntu-latest_20" failed
|
pr-test / unit-test (windows-latest, 22)
The operation was canceled.
|
pr-test / unit-test (windows-latest, 22)
The strategy configuration was canceled because "pr-test.unit-test.ubuntu-latest_20" failed
|
pr-e2e-test / e2e-test (ubuntu-latest, 20)
Process completed with exit code 1.
|
pr-e2e-test / e2e-test (ubuntu-latest, 22)
Process completed with exit code 1.
|
pr-e2e-test / e2e-test (ubuntu-latest, 22)
The strategy configuration was canceled because "pr-e2e-test.e2e-test.ubuntu-latest_20" failed
|
pr-e2e-test / e2e-test (windows-latest, 22)
The operation was canceled.
|
pr-e2e-test / e2e-test (windows-latest, 22)
The strategy configuration was canceled because "pr-e2e-test.e2e-test.ubuntu-latest_20" failed
|
pr-e2e-test / e2e-test (windows-latest, 20)
The operation was canceled.
|
pr-e2e-test / e2e-test (windows-latest, 20)
The strategy configuration was canceled because "pr-e2e-test.e2e-test.ubuntu-latest_20" failed
|