Skip to content

Deploy to Production #5

Deploy to Production

Deploy to Production #5

Manually triggered August 16, 2024 10:05
Status Cancelled
Total duration 31s
Artifacts

cd-prod.yaml

on: workflow_dispatch
Build Backend Image
20s
Build Backend Image
Build Frontend Image
20s
Build Frontend Image
Push Backend Image
0s
Push Backend Image
Push Frontend Image
0s
Push Frontend Image
Deploy with SSH
0s
Deploy with SSH
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Build Backend Image
The run was canceled by @maxmwang.
Build Backend Image
The operation was canceled.
Build Frontend Image
The run was canceled by @maxmwang.
Build Frontend Image
The operation was canceled.