Skip to content
This repository has been archived by the owner on Sep 17, 2020. It is now read-only.

Releases: alattalatta/RimWorld-RedistHeat

RedistHeat 42b

12 Oct 10:08
Compare
Choose a tag to compare
  • Fixed small heater ticking.

RedistHeat 42

03 Oct 04:54
Compare
Choose a tag to compare
  • All buildings equalize/heat/cool 316.67% faster.
  • All buildings equalize/heat/cool 76% weaker.
  • Core cooler label changed to "Medium cooler". (English only)
  • Core heater label changed to "Small heater". (English only)
  • Industrial heater and cooler require "Temperature control" research project.
  • Increased research project cost of "Temperature control" to 1500.
  • Removed "Air circulation" research project.
  • Fixed glower of "Medium heater" stacks every time game loads.

RedistHeat 42a

05 Oct 08:51
Compare
Choose a tag to compare
  • Fixed exhaust ports not working properly.

RedistHeat 41b

13 Sep 04:37
Compare
Choose a tag to compare
  • Fixed dds files throwing errors on Linux/Mac systems.

RedistHeat 41a

10 Sep 09:58
Compare
Choose a tag to compare
  • Fixed industrial cooler not working.
  • Fixed architect menu having two medium heaters.

RedistHeat 41

08 Sep 15:03
Compare
Choose a tag to compare
  • Some building graphics now uses DDS files, instead of PNGs.
  • Added shadow to duct cooler.
  • Added deconstruct designator, which designates pipes or conduits first.
  • Added small cooler and medium heater.
  • Increased power cost of industrial heater to 500 from 360.
  • Removed research prerequisite of industrial cooler.
  • Fixed temperature spiking problem of active vents and smart outlets.

RedistHeat 40

03 Sep 14:16
Compare
Choose a tag to compare

This is a re-release of 40.

  • Proper duct network temperature save-load mechanic that doesn't break games anymore.
  • Fixed AirNetGrid don't initialize after loading a saved game with working duct network.
  • Fixed duct buildings stop working after loading a saved game.
  • Fixed duct building's energyPerSecond not being used while pulling and pushing air.
  • Misc fixes and optimizations.
  • Added duct cooler, a direct cooling building for duct network.
  • Modified all vents and duct buildings to integrate within walls, except duct coolers.
  • All vents and duct buildings now have 30 hit points from 100, except duct coolers.
  • Adjusted smart duct outlet's energyPerSecond to 0.15 from 0.33.
  • Adjusted duct intake's energyPerSecond to 0.9 from 1.0.
  • Adjusted pipe graphic.

RedistHeat 40c

05 Sep 05:16
Compare
Choose a tag to compare
  • Separated duct overlay with power overlay.
    • Building a duct building will display both duct and power overlay.
    • Building a duct pipe will only display duct overlay.
  • Adjusted duct cooler's energyPerSecond to -18 from -15.

RedistHeat 40b

04 Sep 10:54
Compare
Choose a tag to compare
  • Fixed industrial cooler consuming high power regardless of the room temperature it is cooling.
  • Fixed duct coolers and intakes making net temperature to 0 Celsius upon spawning.

RedistHeat 32a

22 Aug 13:10
Compare
Choose a tag to compare
  • Fix
    • Duct networks not splitting.
    • Duct intersection does not work.
    • Duct close icon not displaying.
    • Ducts not using energyPerSecond at all.
  • Adjustments
    • Duct efficiency to 0.85 from 0.33.
    • Misc refactoring.