Skip to content

Merge pull request #8 from cchristiansen/master #98

Merge pull request #8 from cchristiansen/master

Merge pull request #8 from cchristiansen/master #98

Re-run triggered August 1, 2023 02:37
Status Failure
Total duration 9m 13s
Artifacts

cicd.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (ubuntu-latest, 3.8)
Process completed with exit code 1.
test (ubuntu-latest, 3.10)
The job was canceled because "ubuntu-latest_3_8" failed.
test (ubuntu-latest, 3.10)
The operation was canceled.
test (ubuntu-latest, 3.9)
The job was canceled because "ubuntu-latest_3_8" failed.
test (ubuntu-latest, 3.9)
The operation was canceled.
test (macos-latest, 3.9)
The job was canceled because "ubuntu-latest_3_8" failed.
test (macos-latest, 3.9)
The operation was canceled.
test (macos-latest, 3.8)
The job was canceled because "ubuntu-latest_3_8" failed.
test (macos-latest, 3.8)
The operation was canceled.
test (macos-latest, 3.10)
The job was canceled because "ubuntu-latest_3_8" failed.
test (macos-latest, 3.10)
The operation was canceled.