Skip to content

docs(api): refactor-building-block-commands #13655

docs(api): refactor-building-block-commands

docs(api): refactor-building-block-commands #13655

Triggered via pull request September 26, 2023 20:49
Status Failure
Total duration 9m 15s
Artifacts

g-code-confirm-tests.yaml

on: pull_request
Matrix: confirm-g-code
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Confirm G-Code (fast)
socket disconnected
Confirm G-Code (fast)
socket disconnected
Confirm G-Code (fast)
socket disconnected
Confirm G-Code (fast)
socket disconnected
Confirm G-Code (fast)
socket disconnected
Confirm G-Code (fast)
socket disconnected
Confirm G-Code (fast)
Process completed with exit code 2.
Confirm G-Code (swift-turbo)
The job was canceled because "fast" failed.
Confirm G-Code (swift-turbo)
The operation was canceled.
Confirm G-Code (swift-smoke)
The job was canceled because "fast" failed.
Confirm G-Code (swift-smoke)
The operation was canceled.