Merge pull request #3 from jdgratz10/main #10
test_workflow.yml
on: push
pre_commit
18s
Matrix: test_ubuntu
Annotations
6 errors
test_ubuntu (latest, 3.10, 1, 1, v2.9.1, 7.7, latest, latest, 0)
The run was canceled by @jdgratz10.
|
test_ubuntu (latest, 3.10, 1, 1, v2.9.1, 7.7, latest, latest, 0)
The operation was canceled.
|
test_ubuntu (dev, 3, 1, 1, v2.9.1, 7.7, dev, dev, 1)
The run was canceled by @jdgratz10.
|
test_ubuntu (dev, 3, 1, 1, v2.9.1, 7.7, dev, dev, 1)
The operation was canceled.
|
test_ubuntu (oldest, 3.9, 1.20, 1.6, v2.9.1, 7.7, 3.27, 1.8.0, 0)
The run was canceled by @jdgratz10.
|
test_ubuntu (oldest, 3.9, 1.20, 1.6, v2.9.1, 7.7, 3.27, 1.8.0, 0)
The operation was canceled.
|