Skip to content

Add comments to explain cases where the flow loop will shut itself down. #1659

Add comments to explain cases where the flow loop will shut itself down.

Add comments to explain cases where the flow loop will shut itself down. #1659

Triggered via push August 21, 2024 15:40
Status Failure
Total duration 20m 27s
Artifacts

flow_basic.yml

on: push
Matrix: run_sr_insects_tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors, 2 warnings, and 2 notices
Maintenance test on ubuntu-20.04
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 20 minutes.
Maintenance test on ubuntu-20.04
The operation was canceled.
Maintenance test on ubuntu-22.04
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 20 minutes.
Maintenance test on ubuntu-22.04
The operation was canceled.
test_connect (sarracenia.transfer.azure_test) failed: sarracenia.transfer.azure_test#L0
tests/junit/test-results.xml [took 11s]
1 skipped test found
There is 1 skipped test, see "Raw output" for the name of the skipped test.
247 tests found
There are 247 tests, see "Raw output" for the full list of tests.