Skip to content

Incremental DICOM loading #584

Incremental DICOM loading

Incremental DICOM loading #584

Triggered via pull request July 9, 2024 13:05
Status Failure
Total duration 4m 12s
Artifacts 1

e2e.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

3 errors and 5 warnings
E2E Testing on macos-latest
Process completed with exit code 1.
E2E Testing on ubuntu-20.04
The job was canceled because "macos-latest" failed.
E2E Testing on ubuntu-20.04
The operation was canceled.
E2E Testing on macos-latest
pkg-config 0.29.2_3 is already installed and up-to-date. To reinstall 0.29.2_3, run: brew reinstall pkg-config
E2E Testing on macos-latest
cairo 1.18.0 is already installed and up-to-date. To reinstall 1.18.0, run: brew reinstall cairo
E2E Testing on macos-latest
libpng 1.6.43 is already installed and up-to-date. To reinstall 1.6.43, run: brew reinstall libpng
E2E Testing on macos-latest
giflib 5.2.2 is already installed and up-to-date. To reinstall 5.2.2, run: brew reinstall giflib
E2E Testing on macos-latest
pixman 0.42.2 is already installed and up-to-date. To reinstall 0.42.2, run: brew reinstall pixman

Artifacts

Produced during runtime
Name Size
image_comparison_results_macos-latest Expired
19.5 MB