Skip to content

chore(deps): trigger a release based with changie updates (#72) #1

chore(deps): trigger a release based with changie updates (#72)

chore(deps): trigger a release based with changie updates (#72) #1

Triggered via push January 23, 2024 23:00
Status Cancelled
Total duration 4s
Artifacts
Fit to window
Zoom out
Zoom in

Annotations

2 errors
lint / lint / lint
Canceling since a deadlock for concurrency group 'release-composite-refs/heads/main-' was detected between 'top level workflow' and 'test.test'
release-composite
Canceling since a deadlock for concurrency group 'release-composite-refs/heads/main-' was detected between 'top level workflow' and 'test.test'